Enquiry 0Discuss your project
Menu

Stable product reference · RM 205

Review enquiry ↗Find the matching documents ↗
SEED ChemicalsVELOSIT

Product guide

Concrete-section repair mortar

VELOSIT RM 205

VELOSIT RM 205 is a cementitious mortar for rebuilding concrete sections within a specified repair system. It forms the repair layer alongside the required bonding and reinforcement protection.

Product profile
MaterialCementitious repair mortar
RoleConcrete-section rebuilding
InterfaceSpecified bonding and protection
VELOSIT RM 205 bag in the manufacturer source image
Manufacturer packaging reference.
Conceptual repair section. Pin 1 identifies existing concrete, pin 2 repair mortar, pin 3 the bonding interface and pin 4 reinforcement with a separate treatment interface.
RM 205 repair within a reinforced-concrete section.
  1. 1 Sound concrete
  2. 2 RM 205 repair mortar
  3. 3 Separately specified bonding interface
  4. 4 Reinforcement: assessment and treatment specified separately
Concrete-section rebuilding to the specified profile.
Concrete-section rebuilding to the specified profile.

Uses and benefits

Concrete-section rebuilding

Fills assessed repair areas to form the required concrete profile, with repair geometry and reinforcement cover defined for the structure.

Bonded repair system

The referenced concrete application route requires CP 201 and the specified bonding and reinforcement-protection interfaces.

Application notes

Overhead suitability is not established by vertical guidance. Orientation, repair thickness, reinforcement condition, support, access and loading are subject to the repair specification.

Heat development and subsequent finishes form part of the repair design. A visually filled defect does not establish restored structural capacity or acceptance.

SEED ChemicalsVELOSIT

Product guide

Concrete-section repair mortar

VELOSIT RM 205

VELOSIT RM 205 is a cementitious mortar for rebuilding concrete sections within a specified repair system. It forms the repair layer alongside the required bonding and reinforcement protection.

Product profile
MaterialCementitious repair mortar
RoleConcrete-section rebuilding
InterfaceSpecified bonding and protection
VELOSIT RM 205 bag in the manufacturer source image
Manufacturer packaging reference.

Concrete-section rebuilding

VELOSIT RM 205 is a cementitious mortar for rebuilding concrete sections within a specified repair system. It forms the repair layer alongside the required bonding and reinforcement protection.

Repair within a reinforced-concrete section

Conceptual repair section. Pin 1 identifies existing concrete, pin 2 repair mortar, pin 3 the bonding interface and pin 4 reinforcement with a separate treatment interface.
RM 205 repair within a reinforced-concrete section.
  1. 1 Sound concrete
  2. 2 RM 205 repair mortar
  3. 3 Separately specified bonding interface
  4. 4 Reinforcement: assessment and treatment specified separately
Open higher-resolution detail ↗
Concrete-section rebuilding to the specified profile.
Concrete-section rebuilding to the specified profile.

Uses and benefits

Concrete-section rebuilding

Fills assessed repair areas to form the required concrete profile, with repair geometry and reinforcement cover defined for the structure.

Bonded repair system

The referenced concrete application route requires CP 201 and the specified bonding and reinforcement-protection interfaces.

Application notes

Overhead suitability is not established by vertical guidance. Orientation, repair thickness, reinforcement condition, support, access and loading are subject to the repair specification.

Heat development and subsequent finishes form part of the repair design. A visually filled defect does not establish restored structural capacity or acceptance.

Project selection and technical detail

Rebuild a specified concrete section

A cementitious mortar for rebuilding assessed concrete sections within a specified repair system. The required bonding, reinforcement protection and loading criteria are selected for the project.

Concrete-section repair mortar

Conceptual repair detail; not to scale.

Product reference
MaterialCementitious repair mortar
RoleConcrete-section rebuilding
InterfaceSpecified bonding and protection

Confirm the supplied product and the complete project specification with SEED.

Where it fits

  1. 01

    Rebuild a concrete section

    For assessed repairs requiring a specified concrete-repair mortar and its supporting system.

Questions before specification

  1. 01

    Record the repair geometry

    Confirm orientation, extent, reinforcement, support and access before selecting the placing route.

  2. 02

    Coordinate the bonding system

    The described concrete processing route requires CP 201. Confirm its matched instructions and the required repair interfaces.

Coordinate the complete system

  1. 01

    Specify orientation and loading

    Vertical guidance cannot be assumed suitable for overhead work. Repair thickness, cover, loading and acceptance require a project specification.

  2. 02

    Plan the whole repair

    Account for heat development and subsequent finishes. A visually filled defect is not proof of restored structural capacity.

Application guidance

Obtain the matched technical and safety sheets and complete project application instructions for the supplied VELOSIT RM 205 before work.

Discuss your project →

Technical and safety information.

Read the product overview and request the technical and safety sheets for your supplied components.

VELOSIT RM 205 manufacturer technical data sheet · edition 1724

Product properties and application guidance · 1724 · en

Open technical sheet ↗

VELOSIT RM 205 safety data sheet for the supplied product

Handling, storage and safety information

Request safety sheet →

Talk to SEED about your project

Ask for product guidance and the technical or safety sheets you need. Have these details ready when you contact SEED.

  • Assessed defect and repair geometry
  • Orientation, access and temporary support
  • Reinforcement and cover requirements
  • CP 201 and other specified companions
  • Loading, protection and acceptance programme
  • Matching technical and safety information

Product selection guide. This overview does not replace the matched technical data sheet, safety data sheet or project instructions.